Sokhoro Solar Power Station
Sokhoro Solar Power Station | |
---|---|
Country | Ivory Coast |
Location | Sokhoro, Tchologo Region, Savanes District |
Coordinates | 09°31′47″N 05°13′26″W / 9.52972°N 5.22389°W |
Status | Proposed |
Construction began | Q2 2024 Expected |
Commission date | Q4 2025 Expected |
Construction cost | €60.2 million |
Owner | PFO Africa |
Operator | Ferké Solar |
Solar farm | |
Type | Flat-panel PV |
Power generation | |
Nameplate capacity | 52 MW (70,000 hp) |
The Sokhoro Solar Power Station is a planned 52 MW (70,000 hp) solar power plant in Ivory Coast. The solar farm is under development by PFO Africa, an Ivorian subsidiary of the French conglomerate, PFO Energies. When completed, it will be the largest grid-connected solar power station in the country.[1][2]
Location
[edit]The power station is located in the village of Sokhoro, in the Ferkessédougou Department of the Tchologo Region, in the Savanes District, in the extreme north of Ivory Coast.[1][2]
Sokhoro is located approximately 8 kilometres (5.0 mi) by road south of Ferkessédougou, the nearest large urban center.[3] This is about 60 kilometres (37 mi) northeast of the city of Korhogo, the headquarters of Savanes District.[4]
Overview
[edit]The design calls for a ground-mounted photovoltaic solar power plant with generation capacity of 52 me gawatts. PFO Africa, the concessionaire, has formed a 100 percent special purpose vehicle company (SPV) to own, develop, finance, build, operate and maintain this power station. The SPV, called "Ferké Solar", has signed a power purchase agreement (PPA) with the relevant Ivorian entity to supply electricity for 25 years from the day of commercial commissioning. The estimated 90 GWh of annual power production is expected to serve over 370,000 customers.[1][5]
Developers
[edit]The power station is under development PFO Africa, an Ivorian independent power producer (IPP), that is a subsidiary of PFO Energies, a French energy conglomerate.[1][2]
Construction costs, funding, and commissioning
[edit]The construction costs are reported as €60.2 million.[5] Construction is expected to start in H1 2024 and conclude in H2 2025.[1]
See also
[edit]References
[edit]- ^ a b c d e Jean Marie Takouleu (26 January 2024). "Ivory Coast: PFO enters the solar business with its first 52 MW plant in Sokhoro". Afrik21.africa. Paris, France. Retrieved 26 January 2024.
- ^ a b c ReNews (25 January 2024). "Cote d'Ivoire inks deal for 52MW solar plant". Renewable Energy News (ReNews). Retrieved 26 January 2024.
- ^ "Road Distance Between Sokhoro And Ferkessédougou In Ivory Coast" (Map). Google Maps. Retrieved 26 January 2024.
- ^ "Road Distance Between Sokhoro, Ivory Coast And Korhogo, Ivory Coast" (Map). Google Maps. Retrieved 26 January 2024.
- ^ a b Veselina Petrova (26 January 2024). "PFO signs concession deal for 52-MWp PV project in Cote d'Ivoire". Renewablesnow.com. Sofia, Bulgaria. Retrieved 28 January 2024.